欧美熟妇精品黑人巨大一二三区-国产精品视频免费-爆操少妇-麻豆乱码国产一区二区三区-中文字幕日韩有码-一级久久久-久久综合五月天-久久久久亚洲无码-亚洲美女毛片-午夜不卡av免费-99久久人妻无码精品系列-精品视频一区二区三区在线观看-久色在线-天天操天天干天天爱-国产精一区-日本人毛片-欧美怡红院视频-av卡一卡二-成人a级大片-免费成人av在线播放

Welcome to Ningbo Chaori Hydraulic.Co.Ltd.!
CN EN ES
Hotline

(86)13208083169

0574-88850227

Accumulator nitrogen filling vehicle operation steps

未標題-1.jpg

  

Operation steps of the accumulator nitrogen filling vehicle:

The first step: first open the control box three-wire power supply (380V);

Step 2: Open the unloading valve (position reference manual) on the hydraulic module of the pump station until the system oil pressure drops to 0 MPa (ie, the pressure gauge shows 0);

Step 3: Open the top cover of the accumulator, then unscrew the black cap inside, and rotate the handle of the nitrogen-filled special tool to the maximum position (counterclockwise to the maximum), connect the accumulator, and press the special tool handle. Rotate clockwise. When you hear the sound coming out of the gas, observe the pressure gauge on the tool. The pressure display value is the pressure of the accumulator. At this time, turn it counterclockwise to the maximum and remove the special tool.

When the pressure is less than 5 MPa, it is necessary to flush the accumulator. The above is the detection process.